Project Information
The Golen Gol HPP is designed to generate 106 MW and consists of three
units. Main components of the project are a diversion weir, gravel / sand
traps, intake, tunnel, surge chamber and surface powerhouse and over
200 km long 132 kV transmission line.
Client
Pakistan Water & Power Development Authority
Date
On Going Project
Our Role
Construction design / Drawings, Preparation of EIA,
Category
Hydropower




