Project Information
The project includes extension and rehabilitation of transmission line, sub-station and 330kv switchyard. It Facilitate evacuation of power generated from 415 MW Sapele Power Station to the national grid, through Transmission Line with the Associated 330 kV, 330/132, 132/33 kV switchyard.
Client
Niger Delta Power Holding Company
Abuja, Nigeria
Date
November 2010
Our Role
Consultancy Services
Category
Transmission Lines & Sub-stations
Scoope Of Work
PES as the Leader of the Consortium was responsible for:
Approval of detailed engineering design. Verification of drawings, charts and calculations provided by the contractor. Test and receipt of plant/equipment (transformer, circuit-breaker relay cubicles, switchgear, etc). Verify conformity of equipment provided. Monitor and supervision of installation works. Verify quantities and works performed. Update and amend the overall Construction Designs, if necessary. Assist the Employer in any issues relating to contract, especially compliance with the concerned LOT in matters with performance bond, insurance and claims; Verification of quantities of work performed and to certify invoices.