Project Information
A permanent diversion weir (barrier across a river designed to alter its flow characteristics) across Kabul river to divert water in the Kabul River Canal system. This project will ensure diverting the designed discharge of 850 cusec for irrigating 76,720 acres of agricultural land round the year in District Peshawar and Nowshera.
Client
Peshawar Canal Division
Date
Dec, 2010 to Nov, 2015
Role
Detailed Design and Construction Supervision
Category
Irrigation
Scope Of Work
PES was responsible for all office and field activities of the project which includes planning of investigation work including topographic surveys, hydrological studies, geotechnical investigations, hydraulic and structural design, and design of Diversion Weir. PES was responsible for Engineering survey and investigation, Detailed design, Preparation of tender document, Environmental impact assessment and additional studies, Consultation with beneficiaries and Construction Supervision and Management of the Project.