Project Information

The Golen Gol HPP is designed to generate 106 MW and consists of three
units. Main components of the project are a diversion weir, gravel / sand
traps, intake, tunnel, surge chamber and surface powerhouse and over
200 km long 132 kV transmission line.

Client

Pakistan Water & Power Development Authority

Date

On Going Project

Our Role

Construction design / Drawings, Preparation of EIA,

Category

Hydropower

GolenGol
GolenGol2